Our Work: Muck Away, Aggregates & Hazardous Waste Case Studies | TWS
Our work

Real sites. Real numbers.

Muck away, contaminated disposal, aggregate supply and haulage on live construction sites across the Midlands and beyond. Here's what some of those jobs actually looked like.

Constructionline GoldRegistered waste carrier500+ vetted suppliers
Cleared and levelled demolition site in Coventry with a roller compacting the formation
Case studies

Jobs we've done

The material, the deadline, the awkward bit and how it finished.

Pile of contaminated mixed hardcore, soil, rebar and old services on a Coventry demolition site
Coventry · Demolition & remediation

130 loads out, 20,000 tonnes in, five days early

A demolition site with contaminated old ground and a three-week deadline. We cleared it, disposed of the difficult material legally, and rebuilt the formation in 6F2 – finishing ahead of programme.

80 loads hardcore 20 loads contaminated 20,000t 6F2
Read the case study →
Sample of lime powder contaminated with battery acid taken on site for laboratory testing
Hazardous waste · Urgent response

Contaminated lime powder, an EA visit, and a supplier who wouldn't move

The Environment Agency told a site that material on it had to go. Their own waste contractor couldn't get out to sample it. We took a sample the next working day, classified it and cleared it.

Sampled next day Lab classified Disposed & documented
Read the case study →
Quarried aggregate graded and loaded for bulk delivery to a solar farm site
Essex · Solar farm

4,000 tonnes of certified 6F5, delivered in ten days

Access tracks and roadway for a solar farm, to a strict certification spec – from the one regional quarry able to supply it, and only with enough notice to train the material in.

4,000t 6F5 10-day window Certified to spec
Read the case study →
Rotted cardboard mixed into soil forming a slippery layer across a commercial yard surface
Wolverhampton · Commercial yard

A slip hazard, cleared and concreted over

Rotted cardboard worked into the ground had turned a working yard into a slip risk for foot and forklift traffic. We cleared it, found the damaged slab underneath, and put the floor back in C40.

HSE hazard cleared Grab away C40 concrete repair
Read the case study →
Completed five metre concrete panel perimeter wall with RSJ posts at a Wolverhampton commercial site
Wolverhampton · Full site package

They called us for tippers. We ended up doing the whole site.

A muck away enquiry that became clearance, demolition, planting and a five-metre perimeter wall – to a fixed budget and planning conditions, with live gas and leaking water found on the way.

6 trades, one contact Metal rebate returned 5m perimeter wall
Read the case study →
How we work

What these jobs have in common

One point of contact

Muck away, disposal, aggregate and haulage on one account – not four suppliers to chase.

The awkward material

Contaminated ground and mixed streams tested, classified and placed with a licensed facility.

Our edge

Material in, muck out

Lorries leave loaded and come back loaded. Fewer movements, lower haulage, better price.

Daily communication

Truck movements agreed with the site every day, so nobody's guessing what's turning up.

Got a site like these?

Tell us the material, the volume, the postcode and the deadline. We'll come back with a price – usually within the hour.